Foundation and
Site preparation:
Poured-in-place engineered
concrete footings, 24 x 24 x 12 deep, steel reinforced, with concrete CMU and
treated wood shims supporting 12 steel I-beam to provide a crawl space, vented
with commercial grade 12 x 12 metal vents. Tires and axles are removed from
the jobsite on sale projects. Axles are left in the crawl space on lease
projects. Hitches are left in the crawl space on all projects.
Customer is to provide a level (within 8 inches), compacted (2500 psf) dirt
foundation pad with good drainage and is to stake the location and the building
corners. Customer is to provide an all weather road to the jobsite and access
from all sides of the foundation pad.
No
allowance for the cost of landscaping, dirt work, grass replacement or repair of
wheel ruts or repair of other damage caused during the delivery of the unit is
included in this scope of work. If concealed conditions are found below the
ground that affects the cost of the work, the customer is responsible for this
cost.
The customer is solely responsible for placement of the building on the site and
any expenses arising out of the misplacement of the building and/or problems
with easements, fire districts etc.
Floor
Construction:
Steel 12 I-beams supporting 2 x 8 floor joists (2" x 10" on 18' wide units)
with a double subfloor (Ύ plywood and Ό fiber-cement hardi-backer). Moisture
and rodent resistant bottom board. Finished floor to be approximately 30 inches
above grade.
Framing:
2
x 4 walls, wood rafters or trusses and wood engineered matebeams. Exterior
grade sheathing on roof and exterior walls.
All interior walls installed to the rafters and insulated. Support columns will
be concealed in walls wherever possible.
Insulation:
R-11 floor, R-11 exterior and interior walls, R-19 roof.
Exterior
Finishes:
Hardipanel fiber-cement siding, (stucco finish) soffits, skirting, and mansard.
Fiber-cement trim around windows, doors, corners and mansard. Single ply
membrane roofing over densdeck. Commercial grade (5) guttering and downspouts
with concrete splash blocks. Mansard roof provided on full perimeter with 4-6
inch roof overhang and painted hardipanel soffits.
Commercial grade bronzed glass main entry doors (recessed). Commercial steel
exit doors (recessed) with steel frame, vision panel, closer, push/pull hardware
and pull. Best (or equal) construction cores on all exterior doors for customer
installation of final key system. Commercial grade 36 x 52 dual insulated
glass windows, bronze finish, vertical sliders with one inch metal miniblinds.
Colored stucco (customer color choice) to be site-installed over siding and
skirting to provide seamless appearance at skirting line. Trim is painted to
match.
Interior
Finishes:
Lay-in ceiling at 88 interior height, commercial grade 26 ounce carpet with
unitary backing, 1/8 commercial grade vinyl tile in restrooms, breakrooms, and
mechanical areas. Four inch vinyl base (1/8) in all areas. 5/8 Fire-X, Vinyl
covered sheetrock (Hampton Grey) on all interior walls, FRP wainscot in restroom
walls (full perimeter), restroom door signs, door closers and push/pull hardware
on restrooms, solid core pre-finished interior doors in metal frames with
passage hardware. Vision panels supplied on all classroom and conference room
interior doors. Door stops provided for all interior doors.
Casework:
Pre-finished oak (or equal) with plastic laminate finish, doors, shelves,
drawers, large stainless steel sink, upper and lower cabinets, microwave wall
plug.
Plumbing:
Copper supply, handicap restrooms, metal modesty partitions, electric hot water
heater, exterior faucet (frost proof), and PVC Schedule 40 DMV. Metal frame
mirrors. Stainless steel trash/towel dispenser in all large classroom building
restrooms. Toilet paper dispensers provided in all toilet stalls. All commercial
grade fixtures. Laundry tubs with shelf above. Point-of-use water heaters may be
substituted in some locations. The sewer and water drops provided at the factory
will need to be harnessed under the building to the building perimeter. This
work is to be performed by the customers plumbing contractor
Electrical:
115/230 volt, single phase panel box (with locking covers on classroom areas) on
each unit, stubbed down, raceway in metal conduit, fluorescent lighting
(four-tube fixtures) with T-8 energy saving bulbs, exterior plug, emergency
lighting, exit lites, exterior lighting (soffits installed with light sensor),
empty junction boxes (with blank covers) for telephone and data wiring (by
others) with Ύ conduit stubbed up above ceiling.
Fire and Life
Safety:
Smoke detectors (battery operated) are provided along with a 5# pound ABC fire
extinguisher in a recessed fire cabinet at each exit door. Any other fire alarm
or sprinkler systems required will be customer expense.
HVAC:
Wall mount units (color grey or tan/putty) with electric heat strips, fiberglass
ducting, ducted return air, plenum walls, adjustable supply air registers in
office areas, programmable thermostats, and snake pits for condensation lines.
Balancing of the HVAC system is by customer, if applicable.
Steps, Ramps and
Landings:
Treated wood with screw and lag bolt fasteners. Support posts to be installed in
concrete. Unless otherwise stated, one handicap ramp is included in building
cost. Decks for single exterior doors are 5 x 5. Decks for double doors are 6
x 10.
Site Utilities:
Customer to provide all site utilities and connection to the building(s) of all
utilities during construction. Electrical connection to be completed by customer
during the setup to allow for testing of mechanical functions. Customer to
provide and install any required transformer, main electrical distribution
panels, and fire alarm or sprinkler systems that may be required.
Permits:
Customer to
provide and be responsible for all building permits and associated costs and
calls for any inspections that may be required. Licenses, impact fees, utility
fees, state and local taxes and any and all permit costs that may be imposed are
the expense of the customer. The permitting process can be very complicated in
some cities such as
Dallas
. A site plan will
need to be provided to the city by the customer along with details of site
utilities. These plans will be combined with engineered plans provided by Nortex
and used for the basis of the building permit application. Expect the permit
process to take at least 2-3 weeks in large cities. Engineered plans take about
7-10 days after approval of the construction plans by customer. Manufacturing
can not take place until a building permit is issued by the city that has
jurisdiction, without a full release by customer.
Dumpster/Toilet:
Customer to provide dumpster for trash haul-off and restroom facilities for
setup crew and subcontractors.
Cleaning:
Building will be broom swept upon completion of setup and carpet will be
vacuumed. All other cleaning is by customer, unless otherwise stated.
Temporary Power:
Customer to provide temporary power during setup for hand tools etc.
Door
adjustments/site settlement:
Customer to make any door adjustments that need to be made 30 days or more after
setup. Any site settlement that occurs will require releveling of the building
and the customer is responsible for this additional cost and any other costs
associated with the site settlement, if applicable. Nortex is not responsible
for any kind of site movement, settlement of the building or the cost of repairs
related to these incidences.
Codes:
The proposed buildings will
comply with the following list of codes.
Changes required by local codes or due to proximity to existing buildings
have not been considered.
International
Building
Code (IBC) 2000
International Fuel Gas
Code 2000
International Plumbing Code (IPC) 2000
National Electrical Code (NEC) 1999
International Mechanical Code (IMP) 2000
Texas
Industrialized Code
Texas
Accessibility Standard (TAS) 1994
International Energy Conservation Code (IECC) 2000
Options that apply to this order and that modify the above specification:
|
No.
|
Yes
|
No
|
Option Description
|
|
1
|
|
X
|
Termite shields
|
|
2
|
|
X
|
Shingle roof
|
|
3
|
|
X
|
Hi-rib steel roofing and trim
|
|
4
|
|
X
|
Smart Panel wood composite siding and trim
|
|
5
|
|
X
|
Hi-Rib steel siding and trim
|
|
6
|
|
X
|
Mobile Home siding and trim
|
|
7
|
|
X
|
Main electrical distribution
panel and interconnect
|
|
8
|
|
X
|
White Rodgers Thermostat
|
|
9
|
|
X
|
710 Interior ceiling height
|
|
10
|
|
X
|
102 interior ceiling height
with exposed beams
|
|
11
|
|
X
|
Treated wood canopies over exterior
decks
|
|
12
|
|
X
|
Hardipanel soffits for above
optional canopies
|
|
13
|
|
X
|
Plastic commercial grade modesty partitions
|
|
14
|
|
X
|
Bifold automatic commercial glass exterior doors
|
|
15
|
|
X
|
Split system HVAC
with hard start kits (condensation lines to be
connected to sewer system by
customers plumbing contractor).
|
|
16
|
|
X
|
Interior door locksets
|
|
17
|
|
X
|
Parapet exterior walls with scuppers and downspouts
|
|
18
|
|
X
|
Slip resistant vinyl tile floor
|
|
19
|
|
X
|
Chalkboards and Markerboards
|
|
20
|
|
X
|
Poured-in-place concrete decks,
steps and handicap ramp with painted pipe handrails.
|
|
21
|
|
X
|
Tape, float, texture and paint sheetrock walls.
|
|
22
|
|
X
|
Locking covers for thermostats
|
|
23
|
|
X
|
Stucco all exterior trim boards
|
|
24
|
|
X
|
Final interior cleaning by professional cleaners
|
|
25
|
|
X
|
Delete mansard roof overhang
|
|
26
|
|
X
|
2 x 6 exterior walls with R-19 insulation
|
|
27
|
|
X
|
R-30 roof insulation
|
Customer Approval _______________________________________________________
Date ___________________________ Printed Name ____________________________
Title ___________________________